Tata Advanced Systems · Aerospace & defence

Scheduling engine kept, reimplementation avoided

Data transformation moved out of the scheduling engine so it only computes schedules. Run time dropped sharply, and a costly replacement programme was avoided. Live in three plants.

Operation
Three plants live
Systems
ERP, scheduling engine, Excel master data files
Functions
Scheduling and business teams
First answer live
Across three plants
Plants live
3
Scheduling run time
Significantly reduced
Reimplementation cost
Avoided

From the Tata Advanced Systems deployment, published with their permission.

The situation

Existing ERP and scheduling systems were surrounded by a lot of Excel files holding master data that never made it into the ERP.

With significant growth, scheduling software performance had to improve — the alternative was looking for a different product and an entire reimplementation, which is very expensive.

Human errors in the Excel master data were sending the scheduling algorithms into infinite loops.

What they did

Moved all data transformation calculations out of the scheduling engine and into FactoryThread, leaving the engine to do scheduling computation only.

Validated and corrected the Excel-sourced master data before it reached the algorithm, so bad rows stop causing infinite loops.

Applied incremental data techniques and warning analytics so only what changed is processed, and anomalies surface early.

What changed

Scheduling time dropped significantly, and the scheduling team continues on the software they already know.

A full replacement and reimplementation programme was avoided.

FactoryThread is now live in three plants, and is under consideration to replace Alteryx across their factories.